Skyline Car Project
Refrigerated Case Project
To-do list
Refrigerated Case Project
- Project Drawing and Approval Process
- The equipment and dimensions of the existing vehicle are determined.
- According to these measurements, a refrigerated case project is drawn.
- The project is drawn based on the dimensions of the vehicle and chassis.
- The project is prepared and delivered in about 2 days with TSE approval.
- No problems are encountered during application and use.
The refrigerated body project is prepared in accordance with the equipment and dimensions of the vehicle and is completed by following certain steps. All operations are carried out in accordance with legal requirements and the project is prepared according to TSE standards.
- TÜV-TÜRK Vehicle Inspection
- After the project drawing is completed, an appointment is made with TÜV-TÜRK for the vehicle inspection.
- The vehicle is subjected to a detailed inspection.
- During the inspection, the project conformity of the vehicle is checked.
- License and Notary Transactions
- After the vehicle inspection is completed, the vehicle’s license is renewed at a notary public.
- The following documents should be taken to the notary:
- Vehicle license
- Refrigerated crate project
- Inspection report
- Tax Office Transactions
- After the notary process is completed, go to the tax office.
- The tax difference arising from the cash change is determined and tax is paid based on this difference in the following period.
Required Documents
- Vehicle license
- TÜV-TÜRK Inspection Report
- EMC Certificate and TSE Compliance of the Refrigerated Case
- Certificate of Conformity for Zero Vehicles
- Certificates for In-Vehicle Coolers (CE-certificate)
Contact and Service Information
In this process, we work meticulously at every step to provide you with a professional service. For detailed information and consultancy, you can contact us at the number below and get support via e-mail or whatsapp.
What is the Refrigerated Case Project?
The refrigerated body project is prepared in accordance with the equipment and dimensions of the vehicle and is completed by following certain steps. All operations are carried out in accordance with legal requirements and the project is prepared according to TSE standards.
What are the Documents Required for the Frigorific Crate Project?
- Vehicle License
- TÜV-TÜRK Inspection Report
- EMC Certificate and TSE Compliance of the Refrigerated Case
- Certificate of Conformity for Zero Vehicles
- Certificates for In-Vehicle Coolers (CE-certificate)